project plan
Preliminaries
Rough Design Plan(s) [PAA / AW]
Investigation - a few access holes [PAA / AW]
Boiler repositioning survey - get Anton the Plumber to visit; make provisional choice of boiler; Anton 07808 242636 [PAA]
Submit rough design plan to Howdens for detailed design and costing; make provision cabinetry and worktop finish selections to include in quote; contact Martina 0207231 4891 at Bermondsey branch; probably have facetoface meeting to tweak and optimise design; provisional choice of any new appliances [PAA / AW]
James and Atilla to visit for site survey or at least have facetime video session [PAA]; Atila - 07542 385307; James 07904 046971; their new work phone that I’ve bought them - TBA
Ancillairy decisions - sand boards in hallway and landing if possible? Loft insulation in roof rafters? [PAA]. New radiator? Flu exit hole? Anything else?
Ordering - order new kitchen, new boiler and new appliances
Execution of Kitchen
Clear existing kitchen into storage boxes and put in bedroom / out of the way; clear some prep space on lounge; sheet up to protect everything [PAA]
Rip out existing kitchen [JAA]; boys or Anton to remove boiler and seal off gas; waste disposal with ‘wait and load’
Remove pantry wall and support??
Shell prep - lift floor and seal sub-floor / void area; prep walls so square; replaster as necessary; baton ceiling
First fix - set out for new electrics positions, lights in ceiling, rerouting of gas and water pipes
Install new boiler; run flu (need new hole or use existing)
Close up shell - board ceiling, plaster as necessary or dryline; first sand of floor and / or lay sub-floor
Install new cabinetry
Decorate
Second fix - terminate electrics, lights, taps, appliances etc
Afix worktops, doors and fronts
Clean and clear out
design Challenges
Amenity
Sink / window area
The existing wall units foul the window and restrict day light and views
The boiler cupboard is ugly and also consumes the window / view, and offers no worktop / drainer space
The sink is jammed into a corner between the long run and the boiler with little room to stand
Pantry area
The pantry space is mostly used up by its own lobby stand space
Mystery boxing restricts its space
Tall units housing the FF and oven overwhelm the entrance experience and offer no worktop / food prep space
Overall
Long thin shape feels slightly claustrophobic; does not allow social interaction; no connection to lounge
Other
Lots of hinge loose, doors out of alignment
Floor was not laid properly and is damaged
Mouse problem
Opportunities
Spatial
Move the boiler, reposition the sink with more space around it
Use the pantry better, possible with access from hallway
Amenity
Create more storage, more worktop space with a better, more open design
Design
Choose a nicer more contemporary design, improve the lighting and decor
Redo floor
Solve mouse problem
Possible plans with concept ideas
NB The grid squares are 1m2
3D renders - Option A
Simple logical design, plenty of open worktop space and storage; maximum passing space
FF, WM and boiler moved to inside of pantry, all pipework and flus rationalised
Floor lifted, fully proofed for mice and holes, new subfloor laid with new flooring on top or boards restored
option B
Wall seen from lounge / entry is more open with tall units hidden on inside wall
More workop space all around with narrow units providing space for kettle, toaster, fruit bowl etc
Reduced passing space but still c80cm - enough
option c - ???
Open the pantry completely, support as necessary, and use that space along with the rest as part of a holistic design
This idea needs investigation to ensure pantry wall can be supported easily. I would presume it can
very very rough cost estimate
Remove existing / waste management / disconnect - £1k
New kitchen units - £4.5 - £6k
New composite stone worktops £2 - £3k
New Appliances - £1 - 3k or re-use existing - most looked ok
Boiler move - £1.5k; new boiler £1.5k (total £3k); if you moved it, I presume you’d replace it
Building materials (sub-floor, sealant, timber, plaster, ceiling? - £2k
Flooring / lighting - ??
Labour / building work - 2 / 3 weeks - £5k - £7.5k; to solve mouse issue and resolve pipework / flues once and for all, we’s strip it back to shell and start again from under the floor to behind the walls
Total - £15 - £25k
Could create temp kitchen in spare bedroom in meantime whilst works progress
Andrew Williams
November 2022